Project realized within the framework of IV Priority Axis: “Increase of scientific and research potential” of the Operational Programme Smart Development 2014-2020, Activity 4.1 “Scientific research and development projects”, sub-activity 4.1.4 “Application projects” co-financed from the means of the European Regional Development Fund.
Project title: | “New generation haulage system of highly productive longwall systems” |
Acronim: | KOMTRACK |
Contract No.: | Contract No. POIR.04.01.04-00-0068/17 |
Project objective: | The project objective is a development and an implementation of a new generation, flexible haulage system of a shearer self-adjusting to changeable inclinations of a longwall conveyor route caused by mining-and-geological conditions and a conducted technological process using highly productive longwall systems. |
Planned results: | Newly developed haulage system will be adjusted to the power of longwall shearers, used at present, but its flexibility (self-adjustment to changeable inclinations of the conveyor route) will have an impact on:
|
Project cost: | 9 957 644.85 PLN |
Input of European Funds: | 6 768 530.74 PLN |
Project realization period: | July 2018 – June 2021 |
R&D Manager: | Prof. Antoni Kalukiewicz |
Project Executive Manager: | Dr Edward Pieczora |
The project is realized by a consortium consisting of: | KOMAG Institute of Mining Technology – Leader, Foundry Institute, AGH University of Science and Technology – Faculty of Mechanical Engineering and Robotics, Innovative Enterprise of Foundry SPECODLEW Sp. z o.o. and Polish Mining Group S.A. |